El Rincon Elementary Projects Overview

Summer 2017/2018 Projects (Active)

Project Delivery Method: Lease-Lease Back
Architects: Dougherty & Dougherty, GkkWorks, Rachlin Partners
Contractor: Various
       
Project Phase:      
100% 100% 100% 90%
Design Bid & Award Construction Closeout
       

The Summer 2017 Projects include the following scope of work:

 

HVAC Project (Active)

 

Project Delivery Method: Lease-Lease Back
Architect:
Dougherty and Dougherty
Contractor: Envise
       
Project Phase:      
100% 100% 100% 100%
Design Bid & Award Construction Closeout
       

This project includes installation of HVAC units in classroom buildings at El Rincon Elementary School.

 


Energy Conservation Program (Proposition 39) (Completed)

Project Delivery Method: Design-Build
Contractor: Climatec LLC
       
Project Phase:      
100% 100% 100% 100%
Design Bid & Award Construction Closeout
       

The Energy Conservation Program (Proposition 39) includes the following scope of work:

  • Installation of new high efficiency HVAC units
  • Upgrading of interior & exterior LED Lighting
  • Installation of dual technology occupancy sensors
  • Installation of smart programmable thermostats
  • Integration of occupancy sensors
 

Phase I Projects (Completed)

 
Project Delivery Method: Lease-Lease Back
Architects: Rachlin Partners, Dougherty & Dougherty
Contractor: Balfour Beatty Construction
       
Project Phase:      
100% 100% 100% 100%
Design Bid & Award Construction Closeout
       

The Phase I Projects includes the following scope of work:

  • Exterior Painting
    The exterior of the school will be painted in the new school colors.  This project is complete.
  • New Playgrounds
    The playground improvement project at El Rincon Elementary School includes the installation of new playground surfaces and equipment for both kindergarten and elementary school children. The new play equipment will provide a number of age-appropriate activities including elevated platforms, slides and swings. Shade canopies will also be provided and will be integrated with the play equipment. New color-matching rubber play surfaces will also be installed to provide fall protection in compliance with current safety guidelines.  This project is complete.
  • New Bicycle & Skateboard Racks
    This project includes the installation of new bicycle and skateboard racks throughout the campus and has been completed.
  • Video Surveillance
    Conduit, cable and video surveillance cameras will be installed campus wide.  This project is complete.
  • Replace 2nd Floor Deck Waterproofing
    The existing deteriorated exterior decks at the second story of the two story building will have a new waterproof surface installed.  This project is complete.
  • Fire Alarm Repairs
    Remove and replace weather damaged fire alarm conduit lines.  This project is complete.